Frequently Asked Questions

West Side Building Project & Capital Campaign - 2006
- Can you summarize this building project for me?
- Why do we need this building project?
- Why are we not building on the new property next
door?
- What will we do with the new property until we build
on it?
- How much will this project cost?
- Have we gotten competitive bids on this project?
- Is it worth it to spend $1.5 million to relieve
congestion on Sunday mornings?
- Wouldn’t it be better to spend $1.5 million on
missions?
- Isn’t most of the building already
handicapped-accessible?
- How will this project improve accessibility for
those with special needs?
- Are there “life-safety” and code issues being
addressed in this project?
- Are we losing or gaining classroom / meeting space?
- Are we losing or gaining storage space?
- Are we losing or gaining office space?
- How will the relocation of offices affect our staff?
- What benefit will there be for our outreach /
ministry in enlarging the community space by our front entrance?
- Couldn’t we just address the accessibility issues
(ie. elevator) and leave everything else the same?
- Why do we need a Stewardship Consultant?
- Will we have to borrow money to complete this
project?
1. Can you summarize this building project for me?
Basically we plan to open up the entryway to create space for fellowship and
community-building activities; improve accessibility for crowds and special
needs by adding an elevator and widening corridors; consolidate the offices in
the area at the top of the stairs and connect them with the front entry by an
opening in the ceiling; and improve the efficiency of the kitchen, classrooms
and storage space.
2. Why do we need this building project?
Our building has been maintained in excellent condition for over 50 years,
but changing needs and a changing community require some changes in our facility
to help accomplish what we believe God is calling us to do today. West Side is a
dynamic community in which lives are being transformed. But to build that sense
of community, so lacking in our society today, we need space where people can
gather for informal conversation and interaction [see # 16].
In addition, much of the building is difficult or impossible for those with
special needs to access. We have a moral obligation to keep them safe and
include them in the full life of the community. Further, increased ministry has
called for increased staff, requiring work space to be taken from classrooms or
“tucked in” wherever possible. We need to organize and use our space more
efficiently.
3. Why are we not building on the new property next door?
After surveying the congregation and assessing our needs, we believe we do
not need to build on the property we acquired in order to accommodate our
current ministries. Good stewardship seems to require that we first use our
current facility as efficiently as possible. We acquired the property adjacent
to the church when it became available, in order to control what happened there
and to avoid having something built there that might have a negative affect on
our church and our ministries. It also gives us an opportunity to use the
property in the future to accommodate creative new ministries if the need
arises.
>>back to top
4. What will we do with the new property until we build on
it?
We will continue to maintain the property and rent it as housing. Based on an
estimated useful life of 15 years, we have painted and are making improvements
to the roof, windows, insulation, and heating system in order to provide safe,
affordable housing to persons in need. Rental income has helped underwrite some
planning costs. We also may utilize part of the basement for church storage.
5. How much will this project cost?
The most recent construction cost estimates were prepared by our construction
general contractor with input from his subcontractors, and are based upon the
Design Development drawings prepared by our architect at the end of October. If
all of the desired improvements are built, the total construction cost will be
about $1.5 million.
6. Have we gotten competitive bids on this project?
So far we have not obtained competitive bids for this project. We believe we
will obtain the best value and quality project by working with a general
contractor that we know and trust. We have selected Winquist Construction for
that role. Having worked with them in the past on the remodels to the Nursery
and Sanctuary, we have been very pleased with their responsiveness and fairness
and with the quality of their work. Winquist will obtain competitive bids for
some parts of the project.
>>back to top
7. Is it worth it to spend $1.5 million to relieve
congestion on Sunday mornings?
Of course not, although that is a nice side benefit and could eliminate some
liability risks. But obviously the project covers many more important things we
believe will greatly enhance our ministry and mission. [See # 1
& 2 above.] After comparing with similar projects in other
churches, we have been pleased with the cost estimate.
8. Wouldn’t it be better to spend $1.5 million on missions?
Every mission is ultimately local. West Side is first of all called to
mission here in West Seattle. The project is intended to help us do that more
effectively. As we become a healthier community, our vision grows for mission
beyond our borders as well, and West Side is continuing to increase our support
of national and foreign missions. Only a healthy community can support missions
generously.
>>back to top
9. Isn’t most of the building already
handicapped-accessible?
No, unfortunately not. People with special needs are mostly limited to the
street level and activities hosted there. The upper level is not accessible. The
lower level is not technically accessible, as the ramp is steeper than ADA
allows and puts special needs persons at risk. And in any case it can only be
approached by exiting the building and circling through the alley, which is
inconvenient, time-consuming, and exposes people to the elements.
10. How will this project improve accessibility for those
with special needs?
The elevator will access all three floors, and corridors will be widened to
allow ease of movement and quick egress in emergencies. In addition, a new
handicapped-accessible, unisex restroom on the main floor will enable privacy
for those requiring assistance.
>>back to top
11. Are there “life-safety” and code issues being addressed
in this project?
Absolutely. One of the positive consequences of this project will be to make
our building safer, and to bring significant parts of the building into
compliance with current codes. The rearrangement of space will improve emergency
exit routes in many parts of the building, and a sprinkling system will be
installed throughout the southern half of the building (the kitchen, Howell
Auditorium, the library, the chapel, the nursery, the Sunday School rooms and
hallways on both levels).
12. Are we losing or gaining classroom / meeting space?
The total amount of classroom/meeting space remains about the same. We will
eliminate classroom 308 on the upper level, but replace it with a new, slightly
larger conference room on the same level. We will eliminate classroom 309 in the
east wing, but will enlarge and improve access to Lewis Hall on the lower level.
The new “reception” area in the east wing on the main floor will be designed to
be able to be closed off from the entry and foyer, so it can be used as
classroom space, but probably not on Sunday mornings. If the first worship
service time is adjusted to allow for more fellowship time before Sunday School,
however, it will become easier to utilize both Boppell Parlor and the Sanctuary
for adult Sunday School classes.
>>back to top
13. Are we losing or gaining storage space?
The issue is not how much storage space we have, but how we use it and where
it is located. We are eliminating some storage areas and creating others. Within
the proposed plan we have quite a bit of flexibility in the size and
configuration of storage areas, and in the near future we will be refining the
design of these areas in concert with those who use them. In addition we may
utilize storage from the apartments.
14. Are we losing or gaining office space?
We are increasing the amount of office and workroom space by almost 400
square feet in order to accommodate increased staff and a far larger volume of
print communications.
15. How will the relocation of offices affect our staff?
The new arrangement will be far more efficient, and allow better interaction.
It will also allow staff to remain close to the front entrance and center of
activity.
>>back to top
16. What benefit will there be for our outreach / ministry
in enlarging the community space by our front entrance?
One of West Side’s great strengths is that we are a dynamic community in
which lives are being transformed. This space, which will be the most obvious
change, is entirely about creating and nurturing community. The whole idea will
be to avoid a sterile, institutional entrance and create a warm, inviting space
to which people are naturally drawn upon entering the building. It should feel
like the living room in your home, a place for more intimate conversation and
interaction – a place to sit down with a cup of coffee and enjoy your friends,
or meet new friends – a place to which you will want to return. First
impressions are crucial for outreach. Newcomers consistently tell us they were
drawn to West Side because of our facility, but stayed because of our community.
We are already making plans to adjust the Sunday morning schedule to allow
time for fellowship and interaction following worship. Not only will you be able
to stop and talk without impeding the movement of others, but community space
will be used to greet and help orient new visitors. Adequate space will be made
available for those promoting various activities and ministries. Convenient
receptions may follow special activities, or the space may be closed off for
classes or private gatherings. We foresee using the space during the week as
either an elder or youth “drop-in center.” And you will be encouraged to be
creative in designing other activities which will use this space at the very
heart of our West Side community.
17. Couldn’t we just address the accessibility issues (ie.
elevator) and leave everything else the same?
We could possibly do that, but it would still require significant new
construction and reconfiguration of existing spaces in order to provide access
to the elevator on all three levels. Also, it would probably still require that
a sprinkling system be installed in the southern half of the building. And of
course it would not address other issues we feel are also vitally important.
>>back to top
18. Why do we need a Stewardship Consultant?
The scope of this project is significantly larger than anything we have
attempted before. Obviously some of our members are mature believers who will
give sacrificially on their own initiative. But a large number are newer or
younger Christians who have not learned everything the Bible has to say about
stewardship, and have never been challenged to consider the sort of sacrifice
God might ask of a true disciple. If we believe the scriptures, we owe each of
them this opportunity to grow in discipleship and learn something of the joy of
giving [see 2 Corinthians 8 & 9]. It became obvious early on that no
matter how we approached it, this project would require an enormous amount of
time and expertise from anyone called upon to direct it. We knew of no one
either on staff or in the congregation with this amount of time and expertise.
Hiring a consultant is a particularly efficient way of enlarging our staff for
this particular aspect of our ministry. In addition, with this consultant firm
comes a wealth of resources we may use to educate ourselves on stewardship and
communicate the details of the project. Our assessment was that RSI is not only
the largest and most successful stewardship consulting firm, but it is
fundamentally Biblical in its approach. While it is time-consuming, a great
strength of their program is how they inform and mobilize the vast majority of
the congregation, giving each of us an opportunity to share in something very
special happening at West Side.
19. Will we have to borrow money to complete this project?
Because the planned stewardship campaign calls for contributions over three
years, we will need to borrow funds on an interim basis to fund construction
costs. Three years allows most of us to adjust our assets as necessary to
support the project as God directs us. But we will all be challenged to
contribute a significant portion of our gifts at the outset. This multiplies our
gift, as it minimizes the cost of financing. What financing is required will
likely be done through a commercial bank, although other options are being
considered.
>>back to top
|