West Side Presbyterian Church
Seattle, Washington


Construction Photos

Click photos for larger view. Back to construction update.

December | November | October | September | August | July

       
December 2006
 
 
       
       
       
November 2006
Plumbing has been completed so that we can begin using the main floor kitchen again.
Areas that were disturbed for foundation and footing work on the lower level are now able
to be re-framed.  Elevator footings and framing for the concrete walls is in process.  Framing, plumbing and electrical work continues in all areas.
October 2006
During October, excavation for the new elevator and concrete pouring for major interior footings were completed. Other work included demolition, inspections, electrical wiring, and installing heating and air conditioning equipment.

> Back to top

   
September 2006
As construction moved ahead in the front hall area, Sunday services were relocated to Howell Auditorium. The stair removal (to upper and lower floors) was completed; temporary stairs to upper level were installed. Framing continued on main floor, the ceiling was opened up between the main and second floor, large (1200 lbs) beams were installed and brick cleaning continued.

> Back to top

   
August 30, 2006
The main entry is now closed as work progresses on the main and 2nd floors. Wiring is progressing and the upper floor is being reinforced.
August 22, 2006
Main floor stairways -- to upper and lower levels.
   
August 15, 2006
New office/print room roof rafters installed.
 
August 10, 2006
Framing going on this week for the new office/print room over the kitchen.
   
August 5, 2006
Brick Removal Party

> Back to top

July 24, 2006
The demolition begins.

Closets near library

Offices (main floor)

Offices (upstairs)

Offices (upstairs)
July 2006
Preparing for construction.

Construction permit

> Back to top


Construction plans

Packing up the offices